Arc suppression coil is a single-phase reactor used to compensate the capacitive current generated when the power system fails to the ground. The arc suppression coil is connected between the neutral point of the power transformer or ground transformer and the ground in the three-phase power system.
Enforce standards:GB/T11094.6
Technical parameters of 10kV turn suppression coil
Type |
Flow range |
Gear position |
gauge |
Body size (length×width×height)(mm) |
Body weight (kg) |
DCZ-100/10.5 |
5-17A |
7 |
370×1140 |
800×1200×1073 |
600 |
DCZ-150/10.5 |
10-25A |
15 |
400×590 |
840×650×1279 |
700 |
DCZ-200/10.5 |
10-33A |
9 |
400×590 |
840×650×1279 |
730 |
DCZ-250/10.5 |
10-41A |
9 |
490×670 |
900×750×1363 |
820 |
DCZ-315/10.5 |
15-52A |
15 |
490×670 |
900×750×1363 |
910 |
DCZ-430/10.5 |
20-71A |
15 |
400×670 |
930×750×1413 |
1020 |
DCZ-630/10.5 |
31-104A |
19 |
550×790 |
1100×850×1348 |
1600 |
DCZ-800/10.5 |
40-132A |
25 |
600×790 |
1200×850×1500 |
1950 |
DCZ-1000/10.5 |
50-165A |
25 |
600×790 |
1350×850×1650 |
2150 |
Note: Dimensions are for reference only, subject to the round paper and dimensions actually provided.
Installation Instructions
1. Acceptance of the transformer
Before installation, the transformer needs to be accepted. Check whether the transformer appearance is intact and whether the terminals are firm. At the same time, it should also be confirmed that the technical parameters and capacity of the transformer are consistent with the actual needs.
2. Prepare the installation environment
Ensure that the transformer installation environment meets the relevant requirements, including indoor or outdoor ventilation conditions, waterproof measures, etc. The installation ground should be smooth, dry, and have sufficient load-bearing capacity.
3. Security measures
During the installation process, the relevant safety operation procedures should be observed, such as wearing work clothes, safety hats, etc. Ensure workplace safety and prevent electric shock, fire and other accidents.
Shandong Zhifeng Transformer Co., Ltd. is located in the North Rainbow Industrial Park, East Second Ring Road, Linqing City, Shandong Province, a famous canal city, with convenient transportation and beautiful environment. The company covers an area of 45,000 square meters, is a collection of 35KV and below oil-immersed transformer, dry transformer, special transformer, grounding transformer, arc suppression coil, reactor, box-type substation, American box transformer, all kinds of box production, sales, research and development in one of the professional power equipment manufacturing enterprises.
The company strictly in accordance with the ISI9001 quality system operating standards management. The technology of computer aided integrated design is adopted. Combined with the characteristics of the regional environment to design professional products that meet the needs of customers to ensure the high quality of products. The company has: comprehensive performance test bench, high performance voltage withstand equipment, program control frequency conversion power supply, insulation oil chromatograph, acid value tester, insulation oil dielectric strength tester, oil dielectric loss tester and other advanced inspection and testing equipment. Using vacuum drying equipment, digital winding machine, laser cutting line and other superior production equipment. Advanced product technology, complete testing equipment. There are more than 100 employees, including 5 senior engineers and 18 senior technical personnel.
Shandong Zhifeng Transformer Co., Ltd. adheres to the concept of "sincere to the letter, brave to climb the peak", and takes customer satisfaction as the service purpose; We are committed to providing high quality, safe, energy saving and environmentally friendly power products for global power users.
The transformer produced by the company has outstanding quality, excellent price and excellent after-sales service. We will strive for excellence, create more excellent products, and look forward to sincere cooperation with new and old customers.
Frequently asked question
Q: Are you a manufacturer, factory or trading company?
A: Yes, we have been engaged in the development, production and operation of transformers for more than 15 years.
Q: What is your warranty?
A: We offer a 12-month warranty.
Q: Production time?
A: 30 to 45 days or depending on order requirements.
Q: What are your payment terms?
A: T/T, L/C or negotiation.
Q: How does your factory conduct quality control?
A: We carry out 100% QC inspection to ensure that every product is qualified. From raw material to final product manufacturing process, we have more than 10 QC inspections.
Q: Do you have any products in stock?
A: Not normally. All our products are manufactured according to your order quantity.
Q: What does a custom transformer need to provide?
A: Technical drawings and technical specification documents are best, or you can tell us some detailed technical specification dates below "Quote and order required information".
Q: Can I have a catalogue and price list for my MOQ trial order?
A: All of our products are made in China or displayed on the official website, you are always welcome to ask us directly for more information.